PTC BMX track TO DO
list Date: May 2006
Item# |
Priority |
Task
Description |
Contact |
Due
date or Dependency |
01 |
Done |
Complete
3rd straight into 3rd turn – schedule Tom Ritz for
January 12 |
Rob,
team |
20
March |
02 |
Done |
3rd
turn => 2 x 90degree turns, back fill turn 1, platforms for marshals,
scorers |
Rob,
team |
|
03 |
|
Fix
drainage and erosion issues, (sod, straw mat, sandbags, earthmoving) |
Ant,
team |
|
04 |
Done |
Relocate
dangerous faucet (between 2nd and 3rd straight) |
|
|
05 |
Done |
Remove red-dirt from 4th straight
spectator area |
|
|
06 |
|
Remove
trash in woods |
|
|
07 |
Done |
Landscape
sides of starting hill |
Brian
N |
|
08 |
Done |
Build
new moto boards, (Steve Zaubi,
approach H-D for lumber) |
Steve
Zaubi |
See
11 |
09 |
|
Build
marshal platforms, add umbrella holes |
Steve
Z |
See
02 |
10 |
|
Fence
perimeter (black chainlink approved) 4ft, measure, count runs, gates |
Steve
Z |
See
01 |
11 |
Done |
Build
new concession stand |
City
|
|
12 |
|
Polypave
test sites, after proper preparation, drainage |
Larry,
team |
|
13 |
|
Asphalt/polypave last turn |
City |
See 01 |
14 |
Done |
Label
circuit breaker board |
|
See
11 |
15 |
|
Fix
gate – reweld mesh, sheet-metal, use metal plates for ID |
Brian
N /Candy |
|
16 |
|
Paint
lanes on gate, staging (diff colors), relocate compressor to toolroom |
Mike
P /Brian D |
See
15 |
17 |
Done |
Clean
up toolroom and tower (old banners, u/s equipment, add shelves, labels) |
Steves/Alex |
|
18 |
|
Install
motion detector light between 2 buildings |
Brian D |
|
19 |
|
Fix/rebuild
toolroom door (doorjam support) |
Brian
D |
|
20 |
Done |
Cut
keys for authorized personnel, establish key log |
Anthony |
|
21 |
|
Solve
start lights cable routing (carpet, pvc) from |
Brian
D |
|
22 |
|
Organize
connectors for |
|
|
23 |
|
Build
moisture-proof box for PA system, quick-connect, portable. Power-strip |
Don/SteveM |
|
24 |
|
Use
security-gate off old concessions on toolshed |
|
|
25 |
Done |
Set
up track Banner system for 2006, start and finish line, turn 2 boards |
Anthony
|
|
26 |
|
Repair
C/H air compressor – install new pressure switch |
Brian
D |
|
27 |
|
Restore
power to toolroom, install bulb, build guard around bulb |
City/Ant |
|
28 |
|
Ensure
2 faucets working (pressure and flow), hatches above grade |
City/Ant |
|
29 |
|
Cut
large door in back of toolroom – allow 4-wheeler to be stored at track |
Anthony |
|
30 |
|
Service
oil air Ram and piston, lower pressure to where can still raise gate |
Anthony |
|
31 |
|
Purchase new drag mat thru City |
Shayne |
|
32 |
|
Grass
seed on back of turns |
Anthony |
|
33 |
|
Ask
Bobbie (CrimeSafe) to add speaker/s to PA, also see item 18 |
Anthony |
|
34 |
|
Get
CD player with radio (digital tuner) – test reception before buying |
Brian
D |
|
35 |
|
Complete
paving access paths behind staging, concessions and road access |
|
|
36 |
|
Donate
landscaping timbers to city, return
hoses |
|
|
37 |
|
Retrieve
keys, reissue to Brian and Rick |
Anthony |
|
38 |
|
Move
“No Dogs” sign closer to staging |
|
|
39 |
|
Prepare
3rd turn for paving/polypaving
|
|
|
40 |
|
Need
steel grates (3) to cover drain entrances (safety issue) |
City |
|